Permits
When you’re operating equipment near our electricity assets, our permits detail conditions and methods you must adhere to in order to carry out proposed work safely.
If a permit to work is granted, you will be responsible for ensuring that a copy of this permit is always on site in either digital or hard copy form. You’ll also be responsible for ensuring that all members of your crews are briefed on the conditions of the permit to work.
No Go Zones
Designed to keep workers and the public a safe distance from electrical assets. Contractors must apply for permits to work within a No Go Zone.
High load transport
High loads greater than 4.6 metres have the potential to damage power assets and put drivers and the public at risk.
High voltage isolations
If you’re doing work that needs power to be isolated to our electricity distribution network, then an application is required.
Facilities Access Agreement
We support our industry partners by providing leased space for their equipment on our distribution poles through a Facilities Access Agreement.